piscinas

 

     
Catalogue
 
piscinas Back

THE SWIMMING POOL EXPERTS BET ON STEEL POOL

Over the years, traditional systems of construction eventually develop leaks or their appearance deteriorates. In both cases the solution is to renovate the pool with strengthened steel plating. When it comes to renovations, the swimming pool experts go for STEEL POOL

Renovation at the Club La Santa (Lanzarote). An Olympic swimming pool in a high performance sports centre.

piscinas

First Phase:

Cleaning of the old facilities whether they are made from concrete, fibreglass or steel. Removal of deteriorated parts. Carrying out of the structural alterations as required by the customer or as regulations stipulate.
piscinas

Second Phase:

Installation of the steel plating by using the procedure of thermal fusion carried out by specialists from STEEL POOL who are experts in working with this material. 

piscinas

Third Phase:

Sign-posting, filling & it is ready to go.


Request for information
 Name:  Telephone :
 Address:  Town/City:
 Region/Province:  Post/zip code :
 Swimming pool Location city:
 Email:
 What information do you need ?
 How did you find out about us?
piscinas Back

Piscinas Download
 
Catálogo Piscinas Steel Pool
Manual Mantenimiento piscinas

 

  • HOME
  • ABOUT US
  • SERVICES
  • LINKS
  • CONTACT
  • © 2010 PISCINAS STEEL POOL S.L.U.
    Crtra. Chipiona-Sanlúcar km 3.5 - 11550 Chipiona (Cádiz) - 902 108 208 - info@steelpool.com
    Prohíbida la reproducción total o parcial de todos los documentos aquí expuestos.
    Powered by Euro-System Informática S.L.L.

    Buscar